Following series of photos may show inadequate glue and/or failure to comply with manufacturer glue
procedures. A water leaked from this fitting. One question to ask is how this assembly passed the NFPA 13(R)* required hydrostatic pressure test. Another question to ask is was the required hydrostatic test conducted?
*This was a 13R system, occupancy was ordinary combustible construction, a condo.
No comments:
Post a Comment